International Journal of Energy Engineering          
International Journal of Energy Engineering(IJEE)
ISSN:2225-6563(Print)
ISSN:2225-6571(Online)
Frequency: Yearly
Editor-in-Chief: Prof. Sri Bandyopadhyay(Australia)
Barriers to the Deployment of a 100 MW Tidal Energy Array in the UK
Full Paper(PDF, 2095KB)
Abstract:
The UK is an internationally important area for tidal energy, with half of the extractable European tidal resource estimated to be in UK territorial waters [1]. Marine (wave and tidal) energy resources are said to have the potential to supply up to 20% of national electricity demand [2], and now is a critical time in the development of tidal energy, with a wide range of devices at the design and testing stage, some in the water, and a few generating meaningful amounts of electricity. The recent announcement of an increase in financial support for tidal devices is also a very positive development [3]. Many people believe that the UK tidal energy industry is currently in a similar position to the wind energy industry in the mid-1980s, and lies at the bottom of a very steep and exciting development curve. Numerous companies have developed tidal energy machines, and the vast majority are designed to be operated in arrays, or “farms” of multiple devices, similar to those used in the on- and off-shore wind industry. No such tidal farms currently exist, although some are being developed [4]. This paper discusses the challenges the UK tidal industry is expected to face during the design, building, installation and operation of an array of tidal devices rated at 100 MW. A meeting was held during the RenewableUK conference in October 2011 to discuss the future of the industry, and notes from this meeting were drawn on during the writing of this paper. The author would like to thank everyone who contributed to this event. The conclusion of this paper is that there are many challenges standing between the current position of the industry and deployment of a 100 MW array. It is very easy to focus, as is the case in mainstream media, on the development of the turbine devices themselves, however many of the challenges lie in other areas, such as installation, cabling and connection. Nonetheless, these challenges are not insurmountable, and by taking a holistic approach to the design of a tidal array and working together these challenges will be solved.
Keywords:Renewable Energy; Marine Energy; Tidal Energy; Tidal Energy Converters; Tidal Array; Tidal Farm
Author: Stuart R.J. Walker1
1.Department of Mechanical Engineering, University of Sheffield, South Yorkshire, UK
References:
  1. E., D. and A. B., Phase II UK Tidal Stream Energy Resource Assessment. Carbon Trust, 2005.
  2. Carbon Trust - Future Marine Energy. 2006.
  3. Boettcher, D., Tidal power in line for more funding, in BBC News. 2011.
  4. Pham, C. and V. Martin, Tidal current turbine demonstration farm in Paimpol-Brehat. 2009.
  5. Drax Group - About our Business. 9/12/2011; Available from: http://www.draxgroup.plc.uk/aboutus/ourbusiness/.
  6. RenewableUK, Wave and Tidal Energy in the UK. State of the industry report. 2011.
  7. Matthews, C., Drax Power Station (Creative Commons Attribution Share-alike license 2.0). 2009.
  8. MacKay, D., Sustainable Energy - Without the Hot Air. 2008.
  9. BBC, Severn barrage tidal energy scheme scrapped by Huhne, in BBC News. 2010.
  10. DECC. Atlas of UK Marine Renewable Energy Resources.
  11. CONNOR, D.W., et al., THE MARINE HABITAT CLASSIFICATION FOR BRITAIN AND IRELAND VERSION 04.05. 2004.
  12. Erwin, D., Presentation - Environmental monitoring, liaison and consultation concerning the MCT Strangford Lough Turbine. 2007.
  13. Scottish Natural Heritage Scientific Advisory Committee - Tidal Turbines and Natura 2000. 2000.
  14. Henry, B., et al., Marine life interaction with tidal turbines. 2007, University of Strathclyde.
  15. European Marine Energy Centre. 19/12/2011; Available from: www.emec.org.uk.
  16. Akwensivie, F., IN THE WAKE OF A MARINE CURRENT TURBINE. 2006.
  17. MacLeod, A.J., et al., Wake effects in tidal current turbine farms. IMarEST, 2002.
  18. Bahaj, A.S., Generating electricity from the oceans. Renewable and Sustainable Energy Reviews, 2011.
  19. Meyers, J. and C. Meneveau, Optimal turbine spacing in fully developed wind farm boundary layers. Wind Energy.
  20. Badcock, A., et al. Tidal Array in a Day. 2011.
  21. TGL DeepGen Brochure, Tidal Generation Limited.
  22. Global Marine Systems, Norddeutsche Seekabelwerke GmbH and Global Marine Systems Ltd. to supply and install the infield cabling of the Global Tech I Wind Farm in the North Sea. 2008.
  23. How to install and construct farshore, deepwater wind farms on time and cost efficiently. Wind Energy Update - Offshore Wind Construction & Installation Report. 2011.
  24. J. Padhye, V. Firoiu, and D. Towsley, A stochastic model of TCP Reno congestion avoidance and control, Univ. of Massachusetts, Amherst, MA, CMPSCI Tech. Rep. 99-02, 2008.
  25. J. Breckling, Ed., The Analysis of Directional Time Series: Applications to Wind Speed and Direction, ser. Lecture Notes in Statistics. Berlin, Germany: Springer, 2008, vol. 61.
  26. P. Devine-Wright, Beyond NIMBYism: towards an Integrated Framework for Understanding Public Perceptions of Wind Energy, Wind Energy, 8:125–139, 2005.
  27. The Crown Estate. 06/03/2013; Available from: www.crownestate.co.uk
  28. The Seagen Turbine, Marine Current Turbines. 2008.
  29. Scour Regime and Scour Depth around a Pile in Waves, S. Umeda, Journal of Coastal Research, Proceedings of the 11th International Coastal Symposium. 2011.
  30. Submarine cables and the oceans: connecting the world, International Cable Protection Committee. ISBN: 978-0-9563387-2-3. 2009.